Question:
iRep users can adjust the number days that display on the Scheduler page. Users can select one of the following options from a drop-down list:
- 5 Dates (M-F)
- 7 Dates (Su-Sa)
- 10 Dates (M-F)
- 14 Dates (Su-Sa)
How is this feature enabled?
Answer:
An Admin enables the ENABLE_LIST_SCHEDULER Veeva Setting for the user profile and clears Veeva Cache. The user needs to refresh the iRep database.
There is a new Scheduler tab in the iRep My Schedule page, which includes a drop-down list.
Related Documentation:
N/A