0

Veeva CRM Minor Release - 193.10.0

As part of regular system maintenance and optimization, Veeva CRM Sandbox orgs are being upgraded to the 193.10.0 release on Tuesday, January 28. 

Note: Sandbox and Production orgs use the same sync environment, after the sandbox upgrade, defects on the Sync Server will be fixed in production as well.

Production orgs are being upgraded on Friday, January 31.

Comments not allowed