Question:
Jobs can be used to change the lifecycle states of documents with satisfied conditions.
But can jobs change the state of a previous version of a document?
Answer:
The state of a previous version document cannot be updated by a Job even if all the conditions are satisfied. This is because the available actions for previous versions are very limited. Vault recognizes only the latest version of a document as valid.
Related Documentation:
Vault Help Documentation: Working with Previous Versions